Search...Search plugins and themes...
⌘K
Sign in
  • Get started
  • Download
  • Pricing
  • Enterprise
  • Account
  • Obsidian
  • Overview
  • Sync
  • Publish
  • Canvas
  • Mobile
  • Web Clipper
  • CLI
  • Learn
  • Help
  • Developers
  • Changelog
  • About
  • Roadmap
  • Blog
  • Resources
  • System status
  • License overview
  • Terms of service
  • Privacy policy
  • Security
  • Community
  • Plugins
  • Themes
  • Discord
  • Forum / 中文论坛
  • Merch store
  • Brand guidelines
Follow us
DiscordTwitterBlueskyThreadsMastodonYouTubeGitHub
© 2026 Obsidian

OpenGantt

jebbyjebby208 downloads

Create interactive Gantt charts from YAML in your notes.

Add to Obsidian
  • Overview
  • Scorecard
  • Updates8

A lightweight, YAML-driven Gantt chart for the browser, Obsidian, and desktop.

🌐 OpenGantt Website · 📝 Obsidian Plugin · 📦 GitHub Releases

OpenGantt turns a small YAML definition into an interactive Gantt chart with planned work, actual work, multiple start/end ranges per task, live progress, hierarchical tasks, custom columns, printing, and export.

It can be used in three ways:

  • 🌐 Standalone web app — use OpenGantt directly in your browser or as a self-contained HTML application.
  • 📝 Obsidian plugin — embed Gantt charts directly inside Markdown notes.
  • 🖥️ Desktop application — package the same frontend as a native Tauri application.

The chart data remains plain YAML, making it easy to read, edit, search, diff, back up, and keep alongside the project it describes.

OpenGantt: the visual editor beside a Gantt chart

The visual editor on the left (the YAML is one tab away) and the chart on the right: planned and actual bars, a task with two separate actual ranges, tags beside the bars, a deadline marker, shaded weekends and the today line. Names are coloured by branch, with a dot for status.


✨ Features

📅 Gantt charts

  • Planned and actual task bars
  • Multiple planned and actual ranges per task (phased work, pauses, restarts, re-planning)
  • Durations instead of end dates: plan: [2026-09-07, 5d]
  • Parent rows that span their subtasks automatically
  • Manual progress and per-task bar colours
  • Markers for deadlines, holidays and reviews, and weekend shading
  • Live progress for open tasks
  • Day, week, month, and year scales
  • Today indicator
  • Task hierarchy with expandable/collapsible rows
  • Tags, shown quietly beside the bars and in full in the tooltip
  • Family colours for task names: each branch gets its own colour and subtasks drift gradually from it
  • Milestones
  • Planned vs. actual comparison
  • Actual bars with optional diagonal hatching
  • Automatic progress calculation
  • Task status and schedule variance

📊 Customisable task table

The table alongside the timeline can display:

  • Task name
  • Progress
  • Planned start/end dates
  • Actual start/end dates
  • Every planned and actual range of a task
  • Planned duration
  • Actual duration
  • Tags
  • Schedule variance
  • Status
  • Notes
  • Custom YAML fields

Columns can be reordered, hidden, or added from the chart interface. Drag the edge of a heading to resize a column; columns also grow to fit their text on their own. Click a heading to sort.

Any additional property placed on a task automatically becomes available as a custom column.

📝 YAML-driven

Charts are defined using simple YAML:

scale: week
mode: both
title: Example project

rows:
  - label: Stage 1 - Planning
    plan: [2026-09-07, 2026-09-12]
    fact: [2026-09-07, 2026-09-14]

    children:
      - label: Collect requirements
        plan: [2026-09-07, 2026-09-09]
        fact: [2026-09-07, 2026-09-10]

      - label: Write specification
        plan: [2026-09-10, 2026-09-12]
        fact: [2026-09-11, 2026-09-14]

  - label: Stage 2 - Development
    plan: [2026-09-15, 2026-10-10]
    fact: [2026-09-15]

  - label: Stakeholder reviews
    plan: [2026-09-17, 2026-09-18], [2026-09-30, 2026-10-01]
    fact: [2026-09-17, 2026-09-19], [2026-10-02, 2026-10-03]

Because the chart is represented as text, it works particularly well with Git, Markdown, Obsidian, and other text-based workflows.

✏️ Two ways to edit, one chart

  • Visual editor: forms for every option, task, date range, tag and marker, with add, remove, move, indent, outdent and duplicate. Nothing to remember.
  • YAML editor: with line numbers, a highlighted current line, the offending line marked when the YAML has an error, Tab indentation and Ctrl+/ to comment.
  • Both edit the same text and stay in step. Undo and redo cover both.
  • Works the same in the standalone app and inside Obsidian (the Edit button opens the editors in a dialog and saves back into the note).

The visual editor with a task open   The YAML editor with line numbers

🎨 Look and feel

  • Eight colour themes (Gruvbox dark and light, Nord, Dracula, Solarized dark and light, Paper, High contrast), plus Match Obsidian inside Obsidian.
  • Your own CSS: upload a .css file or paste it in; download a template listing every variable.
  • A Help dialog with a YAML cheat sheet and keyboard shortcuts, an About page showing the version, and Credits for everything the app builds on.
  • Resizable where it matters: table columns, the editor/chart divider, the chart height, and the popovers.

The same chart in four themes

The Help dialog

🔎 Finding your way around a big chart

  • Sort rows by any column, ascending or descending. Subtasks stay under their parent; blanks always go last.
  • Filter by text (name, notes, tags) or by tag; matching tasks keep their parents.
  • Tags appear as a small label beside each task's bars and as chips with a tag icon in the tooltip.
  • A Today button, collapse/expand all, and double-click a task to edit it.

The tooltip showing a task's tags


🚀 Quick start

🌐 Web version

Open OpenGantt in your browser →

The web version runs directly in your browser with no installation required.

It provides:

  • Visual and YAML editing (with line numbers), plus undo and redo
  • Open
  • Save
  • Save As
  • Obsidian block copying
  • Example chart
  • Printing
  • PNG export
  • SVG export
  • CSV export
  • Timeline scaling
  • Plan / Actual / Both modes
  • Table and column controls (resize, reorder, sort)
  • Filter, tags and themes
  • Help, About and Credits

The repository also contains a self-contained standalone application:

dist/Gantt.html

Simply open it in a modern browser.

No server is required and the standalone build does not need an internet connection.

📝 Obsidian

OpenGantt is available through the Obsidian Community Plugins.

Install it from:

Settings → Community plugins → Browse → OpenGantt

Alternatively, you can build and install the plugin manually using the development instructions below.

🖥️ Desktop

OpenGantt can also be packaged as a native desktop application using Tauri 2.

See Building the desktop application for instructions.

Keyboard shortcuts

Shortcut Action
Ctrl / Cmd + O Open
Ctrl / Cmd + S Save
Ctrl / Cmd + Shift + S Save As
Ctrl / Cmd + P Print
Ctrl / Cmd + Z Undo (outside the YAML box, which has its own)
Ctrl / Cmd + Shift + Z or Ctrl + Y Redo
Tab / Shift + Tab Indent / outdent lines in the YAML editor
Ctrl / Cmd + / Comment or uncomment lines in the YAML editor
Esc Close a dialog, popover or full screen

📦 Installation

Requirements

For using the web application

No installation is required.

Open:

https://jebbycodes.github.io/OpenGantt/

in a modern browser.

Alternatively, download or clone the repository and open:

dist/Gantt.html

For using the Obsidian plugin

Install OpenGantt from the Obsidian Community Plugins.

No additional dependencies are required for normal plugin use.

For development

The JavaScript build system requires:

  • Node.js LTS
  • npm

The Obsidian plugin build uses esbuild.

For building the desktop application

The desktop version uses:

  • Node.js
  • npm
  • Rust
  • Cargo
  • Tauri 2

The Rust project specifies a minimum Rust version of 1.77.2.


🛠️ Development setup

Clone the repository:

git clone https://github.com/JebbyCodes/OpenGantt.git
cd OpenGantt

Install the JavaScript dependencies:

npm install

The dependencies and available npm scripts are defined in package.json.


🧱 Building

OpenGantt has separate build processes for the standalone application and the Obsidian plugin.

Standalone application

Build the browser version with:

npm run build:app

This runs build-app.mjs.

The build produces:

dist/
├── Gantt.html
└── index.html

Gantt.html is the standalone application intended to be opened directly. It is committed to the repository, so the app works straight after cloning.

index.html is an identical copy that Tauri looks for in its frontend directory. It is generated on every build and is not committed.

Offline operation

The standalone application bundles its required JavaScript, CSS, and js-yaml dependency into the generated HTML.

Nothing needs to be downloaded when the generated file is opened.


Obsidian plugin

Build the Obsidian plugin with:

npm run build

The build produces:

main.js
styles.css

manifest.json is already present in the repository and is copied alongside those files when the optional vault path is supplied.

The build script bundles the plugin while leaving Obsidian, Electron, CodeMirror, and Lezer packages external because they are provided by the Obsidian host application.

Automatically install into an Obsidian vault

Pass the path to your Obsidian vault:

npm run build -- "/path/to/your/vault"

For example, on Windows:

npm run build -- "C:\Users\YourName\Documents\Obsidian Vaults\My Vault"

The build script installs the plugin into:

<vault>/.obsidian/plugins/gantt/

The resulting directory contains:

<vault>/.obsidian/plugins/gantt/
├── main.js
├── manifest.json
└── styles.css

Manual installation

If you build without specifying a vault:

npm run build

copy:

main.js
manifest.json
styles.css

to:

<vault>/.obsidian/plugins/gantt/

Then open Obsidian and go to:

Settings → Community plugins → enable OpenGantt


🖥️ Building the desktop application

OpenGantt uses Tauri 2 for its desktop shell.

The Tauri configuration specifies:

  • Application name: OpenGantt
  • Version: 1.2.0
  • Frontend directory: dist/
  • Frontend build command: npm run build:app

After installing the required Rust/Tauri tooling, build the desktop application with:

npx tauri build

Tauri will first run:

npm run build:app

and then package the generated dist/ frontend into the native application.

For development with the Tauri shell, build the frontend first (dist/index.html is generated, not committed):

npm run build:app
npx tauri dev

The exact native output location depends on the platform and Tauri's build configuration.


🧪 Testing

Run the project's test suite with:

npm test

The test command currently runs tests covering:

  • Model behaviour
  • Timeline calculations
  • Table columns
  • Export functionality
  • Multiple planned/actual ranges
  • Durations, parent rollups, manual progress, colours, markers and weekends
  • Reading and writing YAML for the visual editor, and its row operations
  • Sorting, filtering, tags, name colours, themes (including contrast ratios) and version consistency
  • Browser tests of the real interface (below)

The individual test files are:

test/model.test.mjs
test/timeline.test.mjs
test/columns.test.mjs
test/export.test.mjs
test/segments.test.mjs
test/features.test.mjs
test/serialize.test.mjs
test/arrange.test.mjs
test/browser/ui.test.py

The available test command is defined directly in package.json.

Browser tests

test/browser/ui.test.py drives the built standalone app in headless Chromium: column resizing and auto-fit, sorting, filtering, the visual editor round trip, undo, themes and custom CSS, the dialogs, the divider, line numbers, and the Obsidian edit dialog writing back into a (fake) note. It needs Python with Playwright:

pip install playwright && playwright install chromium
npm run build:app
npm run test:browser

📐 YAML reference

Top-level options

The following options can be placed alongside rows:

Option Values Default Description
scale day, week, month, year day Timeline scale
mode plan, actual, both both Which bars to display
height 200–1600 520 Chart height in pixels
padding 0–365 7 Empty days around the chart
hatch true, false true Diagonal hatching on actual bars
progress true, false true Show progress for open actuals
collapsed true, false false Start with parent rows collapsed
columns Column names Saved layout Select and order table columns
table true, false, hidden Saved layout Show or hide the task table
title Text File name Title used for print/export
weekends true, false false Shade Saturdays and Sundays (day scale)
sort A column, optionally - or desc none Sort rows, e.g. planStart, -progress, name desc
nameColors tree, status, none tree How task names are coloured
tagLabels true, false true Show tags beside the bars
markers List of dates with labels none Vertical lines for deadlines, holidays, reviews

Example

scale: month
mode: both
height: 700
padding: 14
hatch: true
progress: true
collapsed: false
title: EPQ Project

rows:
  - label: Research
    plan: [2026-09-07, 2026-10-10]
    fact: [2026-09-07]

Task properties

Each task can contain:

Property Description
label Task name
plan Planned start/end dates, or a list of ranges
fact Actual start/end dates, or a list of ranges
children Nested tasks
notes Additional information
progress Progress set by hand, e.g. 60 or 60%
color Bar colour, e.g. "#e06c75" or teal
tags Labels, e.g. [design, urgent] (or design, urgent)

Additional properties become custom table columns.

For example:

rows:
  - label: Write literature review
    plan: [2026-10-01, 2026-10-14]
    fact: [2026-10-02, 2026-10-17]
    owner: Alex
    priority: High

This automatically makes owner and priority available as table columns.


Planned dates

A normal planned task uses two dates:

plan: [2026-10-01, 2026-10-14]

A single planned date creates a milestone:

plan: [2026-10-14]

Actual dates

A completed or ongoing task can have an actual start and end:

fact: [2026-10-02, 2026-10-17]

An open task can contain only its actual start:

fact: [2026-10-02]

Open actual tasks extend to the current date and can display their calculated progress.


Multiple ranges

Work does not always happen in one continuous block. Give plan and/or fact a list of ranges when a task is done in phases, paused and resumed, or re-planned:

rows:
  - label: Build prototype
    plan:
      - [2026-09-07, 2026-09-12]
      - [2026-09-21, 2026-09-25]      # second planned phase after a gap
    fact:
      - [2026-09-07, 2026-09-10]
      - [2026-09-14, 2026-09-18]      # paused, then resumed
      - [2026-09-28]                  # still open

The same thing with each range in its own brackets on one line:

plan: [2026-09-07, 2026-09-12], [2026-09-21, 2026-09-25]
fact: [2026-09-07, 2026-09-10], [2026-09-14, 2026-09-18], [2026-09-28]

Plain YAML does not allow that, so OpenGantt rewrites such plan: / fact: lines to the standard nested form before parsing. The standard form, plan: [[2026-09-07, 2026-09-12], [2026-09-21, 2026-09-25]], works too, and your saved text is never altered.

How it behaves:

  • Each range is drawn as its own bar in the same row. The gaps between ranges stay empty.
  • The single form (plan: [start, end]) still works, and you can mix both forms in one chart. A list with one range is the same as the single form.
  • Ranges are sorted by start date, so they can be written in any order. A range written end-first is swapped, and a range with only one date is a single day.
  • In fact, a range with only a start date is an open range, but only when it is the last one. It becomes the live progress bar. A start-only range earlier in the list is a one-day range.
  • Ranges may overlap; days covered twice are counted once in the duration columns.

Whole-task values. The table, status and variance treat the task as one span:

Value With several ranges
Start planned / actual The earliest start
End planned / actual The latest end (ongoing while the last actual range is open)
Planned days / Actual days Days inside ranges only; gaps are not counted
Variance Latest actual end against latest planned end
Progress 100% once the last actual range is closed; otherwise the share of planned days elapsed, counting only planned ranges
Status Based on the whole span, as for a single range

Hover a bar to see every range listed on its own line (Planned 1, Planned 2, Actual 1, ...).


Durations

Instead of an end date, give a length. The end day is included, so 5d starting on a Monday ends on the Friday.

plan: [2026-09-07, 5d]                       # 7 - 11 Sep
plan: [2026-09-07, 2w]                       # 7 - 20 Sep
plan: [2026-09-07, 3d], [2026-09-21, 1w]     # works with several ranges too
fact: [2026-09-07, 10 days]

Accepted units are d, day(s), w, week(s). A week is 7 days. Durations work in plan and fact.


Parent rows span their subtasks

A task with children and no plan or fact of its own takes its dates from its subtasks:

rows:
  - label: Stage 3 - Ship
    children:
      - label: Final checks
        plan: [2026-10-12, 3d]
      - label: Release
        plan: [2026-10-15, 2026-10-16]
  • Planned runs from the earliest planned start to the latest planned end.
  • Actual starts at the earliest actual start. It stays open (drawn as live progress) until every subtask that has a plan is finished.
  • This works through any number of levels. A parent that sets its own plan or fact keeps it.
  • The tooltip says from subtasks for such rows.

Progress by hand

Progress is normally calculated. Set it yourself with progress when you know better:

- label: Write report
  plan: [2026-10-01, 2026-10-14]
  progress: 60%        # 60 works too, values are kept between 0 and 100

It is shown in the Progress column and the tooltip, even if the task has no actual dates, and it replaces the calculated value. (This is a task key; it is separate from the chart-level progress: option.)


Colours

Give a task its own colour to group or highlight work:

- label: Legal review
  color: "#d3869b"      # hex, or a plain colour name such as teal
  plan: [2026-10-01, 2026-10-14]
  fact: [2026-10-02]

The colour applies to the task's planned bar, and to its striped actual and progress bars. Anything that is not a hex colour or a plain colour name is ignored. Quote hex colours so YAML does not read # as a comment.


Markers

Mark important dates with a labelled vertical line across the whole chart, such as deadlines, holidays or reviews. Put markers next to rows:

markers:
  - date: 2026-10-10
    label: Build deadline
  - [2026-11-02, Half term]
  - 2026-12-25 Christmas
  • The three forms above are all accepted, and the date alone is fine.
  • The timeline stretches to include markers outside your task dates.
  • Markers appear in the chart, the legend, print and image export. Hover the line for the full label.

Weekends

weekends: true

shades Saturdays and Sundays on the day scale, so it is clear which days are off. Other scales are too coarse to show them. It is also shown in print and image export.


Tags

- label: Wireframes
  tags: [ui, review]        # or  tags: ui, review   or  tag: ui
  • A small tag icon and the tags sit just beyond the end of the task's bars (before them when there is no room), in a quiet colour so they don't compete with the bars. Up to three are shown, then +2. Turn them off with tagLabels: false.
  • The tooltip shows every tag as a chip with the tag icon. Each tag word always gets the same colour.
  • The toolbar's tag drop-down filters the chart to a tag.
  • # in front of a tag is ignored (#ui is ui); tags are matched without regard to case.

Sorting

sort: planStart          # earliest first
sort: -progress          # highest progress first (a leading - means descending)
sort: name desc          # or  sort: { by: status, dir: desc }

Any column works: the built-in ones (see Table columns) or a custom field such as owner. You can also sort without touching the YAML: click a column heading (ascending, then descending, then back to the original order) or use the Sort button. A choice made on screen is kept until you press Reset.

Subtasks always stay under their parent, so sorting reorders tasks only among their siblings. Tasks with nothing in the chosen column go last, in either direction. Status sorts by urgency (overdue first), not alphabetically.

Sorted by Progress, with the resize grip showing on a column heading

Sorted by progress (the arrow in the heading). Hovering a heading's right edge shows the resize grip. Each task kept its colour.


Name colours

By default each top-level task gets its own colour, and its subtasks drift gradually away from it, so a branch of the tree reads as a family. The colours are generated from the chart (the same chart always gets the same colours, and a task keeps its colour when you sort or filter) and tuned to stay readable: bright on dark themes, deep on light ones. A task with its own color: starts a new family from that colour. A small dot before each name shows its status (not started, in progress, overdue, completed, completed late).

nameColors: tree      # default: family colours + status dot
nameColors: status    # colour the text by status instead
nameColors: none      # plain text

Hierarchical tasks

Use children to create nested tasks:

rows:
  - label: Stage 1 - Research
    plan: [2026-09-07, 2026-10-01]

    children:
      - label: Find sources
        plan: [2026-09-07, 2026-09-14]

      - label: Evaluate sources
        plan: [2026-09-15, 2026-09-21]

      - label: Write notes
        plan: [2026-09-22, 2026-10-01]

Parent rows can be expanded or collapsed using the chart controls.


✏️ The visual editor

Open the Visual tab (standalone) or press Edit (Obsidian). It has three parts:

  1. Chart settings: title, scale, which bars, height, padding, name colours, the table, sorting, striped and progress bars, weekends, tags, collapsed start, and which columns this chart shows.
  2. Markers: dated lines with a label.
  3. Tasks: click a task to open its form. You can rename it, add any number of planned and actual ranges (each is "to a date", "for a length" such as 5d or 2w, or a single day / still open), set progress and a bar colour, add tags, write notes, add custom fields (each becomes a table column), and move it up or down, indent or outdent it, add a subtask, duplicate it or delete it.

Every change is written to the YAML straight away. Because the editor writes the YAML itself, it uses its own tidy layout and comments are not kept when you edit visually. Edits in the YAML tab never lose anything. Unknown options and custom fields are preserved.

Double-click a task in the chart to open it in the editor.


🎨 Themes and custom CSS

Open Theme on the chart toolbar. Themes only change colours, through a small set of CSS variables defined in src/styles.css (--og-* for the palette, --tsg-* for status, bar and today colours).

Theme Scheme
Gruvbox dark (default), Nord, Dracula, Solarized dark, High contrast dark
Gruvbox light, Solarized light, Paper (print-friendly) light
Match Obsidian (Obsidian only) follows Obsidian

Custom CSS: click Upload .css… or paste into the box. Press Template to download a file listing every variable with its current value. Your CSS is applied after the theme and always wins over it (themes sit in a CSS cascade layer), so you can override a single colour or restyle anything:

.epq-gantt-block, :root {
  --og-accent: #ff6ac1;
  --tsg-chart-bar-color-1: #6ac1ff;   /* planned bars */
  --og-scheme: dark;                  /* "light" tunes the name colours for a light background */
}

The theme picker with the custom CSS box

Themes and custom CSS are saved in the browser (standalone) or with the plugin's data (Obsidian). The print and image export has its own light/dark choice, so a dark screen theme still prints on white.


↔️ Resizing

What How
A table column or the Name column Drag the right edge of its heading. Double-click the edge to fit the text again. Fit widths in Columns resets all of them.
Automatic width Columns grow to fit their text unless you have set a width.
Editor / chart divider (standalone) Drag it, double-click to reset, or use the arrow keys when it is focused.
Chart height (Obsidian) Drag the bar along the bottom edge; double-click it to reset.
Popovers (Columns, Sort, Theme, Export) Drag their bottom-right corner.

Column widths are shared by every chart, like the column layout.


📊 Table columns

The chart includes several built-in columns.

Column YAML name Description
Progress progress Percentage of planned time elapsed, or the value set with progress:
Start planned planStart Planned start date
End planned planEnd Planned end date
Start actual actualStart Actual start date
End actual actualEnd Actual end date
Planned days planDays Planned duration
Actual days actualDays Actual duration
Variance variance Difference from planned completion
Status status Current task status
Tags tags The task's tags
Notes notes Task notes
Planned ranges planRanges Every planned range, separated by ;
Actual ranges actualRanges Every actual range, separated by ; (ongoing while open)

For example:

columns:
  - progress
  - planEnd
  - actualEnd
  - variance
  - status

You can also use:

columns: none

to hide the table columns.


💾 Saving and file formats

OpenGantt can work with several file types.

Input Save behaviour
.md Replaces only the selected Gantt block
.yaml / .yml Saves YAML
.txt Saves YAML using the same extension
Other text files Saves YAML using the original extension

When editing a Markdown note containing a Gantt block, OpenGantt preserves the rest of the note.

This includes:

  • Frontmatter
  • Headings
  • Other Markdown content
  • Other code blocks
  • Content after the Gantt chart

If a Markdown note does not contain a Gantt block, OpenGantt can add one without replacing the rest of the document.


🖨️ Print and export

OpenGantt supports printing and several export formats.

Print

The print renderer:

  • Prints the complete chart rather than only the visible portion
  • Includes expanded rows
  • Includes the selected columns
  • Supports the current chart scale and mode
  • Uses a light print-friendly colour scheme
  • Splits long charts across pages
  • Repeats the heading on subsequent pages
  • Avoids cutting rows between pages
  • Numbers pages

You can use your browser's Save as PDF option to create a PDF.

Export formats

The export panel supports:

  • PNG — raster image
  • SVG — editable vector image
  • CSV — spreadsheet-compatible task data

CSV exports include every task, including tasks hidden by collapsed parent rows. The Planned ranges and Actual ranges columns export as start..end; start..end in ISO dates (an open range ends in ..), so no range is lost in a spreadsheet.


📝 Obsidian usage

OpenGantt can render charts directly inside Obsidian Markdown notes.

Install OpenGantt from the Obsidian Community Plugins, then add a gantt code block:

```gantt
scale: week
mode: both

rows:
  - label: Stage 1 - Planning
    plan: [2026-09-07, 2026-09-12]
    fact: [2026-09-07, 2026-09-14]

    children:
      - label: Research
        plan: [2026-09-07, 2026-09-09]

      - label: Planning
        plan: [2026-09-10, 2026-09-12]
```

The YAML is visible while editing the Markdown source and is rendered as a chart in Reading View.

Alternative code-block name

If another Obsidian plugin already uses the gantt code-block name, OpenGantt can use:

```epq-gantt
rows:
  - label: Example
    plan: [2026-09-07, 2026-09-12]
```

🎛️ Obsidian controls

The Obsidian chart toolbar provides:

  • Day / Week / Month / Year
  • Plan / Actual / Both
  • Expand all / Collapse all
  • Table, Columns (including Fit widths)
  • Sort and a filter box with a tag drop-down
  • Today
  • Edit: the visual and YAML editors in a dialog; Save to note writes the new YAML back into just that code block
  • Legend, Print, Export, Full screen
  • Theme: pick a theme or upload custom CSS
  • Help: help, about and credits
  • Reset (clears sort, filter and a dragged chart height)

By default the chart uses its Gruvbox dark colours. Choose Match Obsidian in Theme to follow whatever Obsidian theme you use.

Saving from the Edit dialog replaces the lines of that one block, and only if the note still contains what the chart was drawn from; if you edited the note in the meantime it refuses, leaves the note alone and puts the new YAML on your clipboard. Edit works in Reading view; in Live Preview it works wherever Obsidian can report the block's position, and otherwise copies the YAML for you to paste.

Full-screen mode uses browser fullscreen where supported. On environments where browser fullscreen is unavailable, OpenGantt expands within the available Obsidian window.


🏗️ Project structure

OpenGantt/
│
├── app/
│   ├── app.css
│   ├── icons/                 (favicon and header icon, from logo.png)
│   ├── shell.js
│   └── shim.js
├── docs/
│   └── screenshots/           (the README pictures)
├── scripts/
│   ├── screenshots.py         (regenerates docs/screenshots)
│   └── sync-version.mjs       (package.json version -> manifest, Tauri, lockfile)
│
├── dist/
│   └── Gantt.html            (generated; index.html is built next to it but not committed)
│
├── src/
│   ├── model.js               (YAML -> tasks)
│   ├── timeline.js            (axis, bars, markers, tag labels)
│   ├── columns.js             (table columns, widths, sorting values)
│   ├── arrange.js             (sort and filter)
│   ├── tree-colors.js         (family colours for task names)
│   ├── themes.js              (themes, custom CSS)
│   ├── serialize.js           (visual editor's YAML writer and row operations)
│   ├── visual.js              (the visual editor)
│   ├── codeeditor.js          (YAML editor with line numbers)
│   ├── dialog.js, dom.js      (dialog and element helpers)
│   ├── help.js                (help, about, credits)
│   ├── chart.js               (on-screen chart)
│   ├── export.js              (print and image export)
│   ├── main.js                (Obsidian plugin and chart block)
│   └── styles.css
│
├── src-tauri/
│   ├── Cargo.toml
│   ├── tauri.conf.json
│   └── ...
│
├── test/
│   ├── model.test.mjs
│   ├── timeline.test.mjs
│   ├── columns.test.mjs
│   ├── export.test.mjs
│   ├── segments.test.mjs
│   ├── features.test.mjs
│   ├── serialize.test.mjs
│   ├── arrange.test.mjs
│   └── browser/ui.test.py
│
├── vendor/
│   └── js-yaml.min.js
│
├── build-app.mjs
├── esbuild.mjs
├── package.json
├── package-lock.json
├── manifest.json
├── LICENSE
├── THIRD-PARTY-NOTICES.md
└── README.md

Important directories

Path Purpose
app/ Standalone application's editor and browser shell
src/ Core Gantt chart implementation
src-tauri/ Tauri desktop application
test/ Automated tests
vendor/ Local third-party browser dependencies
dist/ Generated standalone/Tauri frontend

main.js and styles.css appear in the project root only after npm run build (the Obsidian plugin build); they are generated and not committed.

Important build files

File Purpose
build-app.mjs Builds the standalone HTML application
scripts/sync-version.mjs Copies the version from package.json everywhere it is needed
esbuild.mjs Builds the Obsidian plugin
package.json Defines dependencies and npm scripts
src-tauri/tauri.conf.json Configures the Tauri application
src-tauri/Cargo.toml Defines the Rust/Tauri package

🔧 Available npm commands

Command Purpose
npm install Install development dependencies
npm run build Build the Obsidian plugin
npm run build:app Build the standalone HTML application
npm test Run the automated tests
npm run test:browser Run the browser tests (needs Playwright)
npm run version:sync Copy the package.json version into manifest.json, the Tauri config and the lockfile
npm run version:check Fail if any of those disagree with package.json
npm run screenshots Regenerate the README screenshots (needs Playwright)

One version, in one place

The version lives in package.json and nowhere else you need to edit. Both builds copy it into manifest.json (which Obsidian reads), src-tauri/tauri.conf.json, src-tauri/Cargo.toml and package-lock.json, and the standalone app shows it in the page header, the About box and the help dialog. To release a new version, change "version" in package.json and build. npm test fails if the files ever drift apart.


🧩 Architecture

OpenGantt uses a shared chart implementation across its different interfaces.

                    ┌─────────────────────┐
                    │      YAML data      │
                    └──────────┬──────────┘
                               │
                               ▼
                    ┌─────────────────────┐
                    │   OpenGantt model   │
                    └──────────┬──────────┘
                               │
                 ┌─────────────┼─────────────┐
                 │             │             │
                 ▼             ▼             ▼
             Browser        Obsidian       Tauri
             frontend        plugin        desktop
                 │             │             │
                 └─────────────┼─────────────┘
                               ▼
                     ┌──────────────────┐
                     │ Gantt renderer   │
                     │ Timeline + table │
                     └──────────────────┘

The editors (visual and YAML), themes, sorting and dialogs are plain DOM modules that do not depend on Obsidian, so the standalone app and the Obsidian plugin run exactly the same code; the only differences are where the chart's settings are saved and what Edit does (switch tabs, or open a dialog and write back into the note).

The standalone builder embeds the application's JavaScript, CSS, and YAML parser into a single HTML file. The Tauri configuration then uses the generated dist/ directory as its frontend.


🔗 ts-gantt

OpenGantt is based on the ts-gantt project.

ts-gantt provides the underlying Gantt-chart concepts and rendering foundation, while OpenGantt adds its own:

  • YAML-driven format
  • Planned/actual/progress workflow
  • Gruvbox-inspired interface
  • Custom table columns
  • Tooltip system
  • Print renderer
  • Export system
  • Standalone application
  • Obsidian integration

The underlying ts-gantt project is MIT licensed. OpenGantt itself is released under the Unlicense.


🤝 Contributing

Contributions, bug reports, improvements, and feature ideas are welcome.

Before submitting a change:

  1. Fork the repository.

  2. Create a branch for your change.

  3. Install dependencies with npm install.

  4. Make your changes.

  5. Run the test suite:

    npm test
    
  6. Test the relevant build:

    npm run build
    

    or:

    npm run build:app
    
  7. Open a pull request with a clear description of the change.

For UI changes, include screenshots where useful.


🐛 Reporting bugs

When reporting a problem, include as much of the following as possible:

  • Operating system
  • Browser or Obsidian version
  • OpenGantt version/commit
  • Whether you are using the web app, Obsidian plugin, or desktop application
  • The YAML that reproduces the issue
  • Console/build errors
  • Screenshots or recordings when appropriate

A minimal reproducible example makes debugging considerably easier.


📄 License

OpenGantt is released into the public domain under the Unlicense.

See LICENSE for the full license text.

OpenGantt incorporates the MIT-licensed ts-gantt project.


🙏 Acknowledgements

  • ts-gantt — underlying Gantt chart foundation
  • js-yaml — YAML parsing
  • Obsidian — Markdown knowledge-management platform supported by the plugin
  • Tauri — desktop application framework
  • Colour palettes Gruvbox, Nord, Dracula and Solarized: the themes re-create their colours; no code is included.

Licences and attributions for everything bundled are in THIRD-PARTY-NOTICES.md, and in the app under Help → Credits.


⚠️ Project status

OpenGantt is an actively developed open-source project.

The repository currently contains a standalone browser application, an Obsidian plugin, and a Tauri desktop shell. Features and interfaces may change between versions.

The latest web version is available at:

🌐 https://jebbycodes.github.io/OpenGantt/

If you are using OpenGantt for important project planning, keep your YAML/Markdown source files under version control or maintain regular backups.

HealthExcellent
ReviewSatisfactory
About
Create interactive Gantt charts from simple YAML and embed them directly in Obsidian notes. View planned vs actual work with live progress, hierarchies, milestones, custom columns, and export/print charts while keeping data as plain, versionable YAML.
Project managementChartsTasks
Details
Current version
1.3.0
Last updated
Last month
Created
2 months ago
Updates
8 releases
Downloads
208
Compatible with
Obsidian 0.12.2+
Platforms
Desktop, Mobile
License
Unlicense
Report bugRequest featureReport plugin
Author
jebbyjebby
GitHubjebbycodes
  1. Community
  2. Plugins
  3. Project management
  4. OpenGantt

Related plugins

Tasks

Track tasks across your vault. Supports due dates, recurring tasks, done dates, sub-set of checklist items, and filtering. Maintained by Clare Macrae and Ilyas Landikov, created by Martin Schenck.

Operon

Task and project management system that unifies inline tasks and file-based tasks in the same workflows with Tables, Filters, Calendars, Kanban boards, Gantt views, Canvas, and time tracking.

Base Board

Organize notes into Kanban boards using frontmatter properties. Drag and drop cards between columns powered by Bases.

dotpm

Full-featured task and project management: stunning Gantt charts, Kanban boards, Table views, customizable fields, due date notifications, dependancies

Task List Kanban

Organizes all of the tasks within your files into a kanban view.

Abyss Tasks

A task management interface for Markdown tasks.

Apex Dashboard

Your personal command center — memos, todos, files, projects all connected for better workflow.

Gantt Calendar

A powerful visual task management plugin. Visualize and manage tasks created by the Tasks plugin, supporting both emoji and Dataview task formats. Support Feishu Task syncing.

TODOseq

Lightweight keyword-based task tracker using Logseq style keywords.

Task Board

Manage all your tasks throughout your vault from a single board and much more...