Alexandre Charbit45 downloadsForecast Jira goals and epics through development, staging, and production with sprint-aware dates, Gantt timelines, and team calendars.
Path to Prod is an Obsidian plugin that forecasts when a Jira goal will finish development, staging, and production. It does not require story points. Instead, it learns stage durations from completed Jira issues, finds comparable tickets, and runs a capacity-aware Monte Carlo simulation.
Forecast dates are probabilistic planning aids, not commitments. Sparse history, workflow changes, unrecorded dependencies, and inaccurate calendar data can materially affect results.
npm install
npm run check
To test in Obsidian, copy or symlink this directory into a development vault at .obsidian/plugins/path-to-prod, run npm run dev, reload Obsidian, and enable Path to Prod under Community plugins. Use a separate development vault.
https://api.atlassian.com/ex/jira/<cloudId> as the API base URL./jira is supported in the base URL. A 407 error points to proxy authentication; HTML instead of JSON usually means a proxy, SSO, or login page is intercepting the API call. Ask your administrator to allow Obsidian access to the approved Jira API host and trust the required company TLS certificate. Do not put proxy credentials in the Jira token field. Data Center returns changelogs through expand=changelog; if the server truncates them, Path to Prod stops rather than forecasting from incomplete history.{{project}} to reference the configured company project key.To forecast epics, set Epic JQL and open Epic timeline. Adjust the unrefined reserve for each epic as its scope becomes clearer. Set sprint length and the important-work target in the dashboard. Jira priorities and labels can mark work as important automatically, and each epic or child ticket can also be marked manually. The watch compares the epic's P80 production date with the target for its important scope; it is a signal to review the plan, not an individual ticket completion forecast. Kanban work without a Jira due date is shown as needing a target rather than given a sprint alert. Each epic uses the full configured team capacity independently, so simultaneous epic dates are not a combined portfolio commitment.
Use Email draft on the goal or epic dashboard to open the default email client with a suggested subject and copy the current forecast for pasting into the draft. Copy for email only copies the report. Rich paste retains the colored environment cells; clients that only support plain text receive the same dates, ISO week numbers, and important-work alerts as text. The plugin does not send email or choose recipients.
Path to Prod supports Basic authentication for Atlassian Cloud API tokens and Bearer authentication when the email field is blank, including Jira Data Center/Server personal access tokens. The Jira token is stored in Obsidian SecretStorage; the plugin data keeps only its secret name. Existing plaintext tokens are migrated when the plugin loads. Use a revocable token and protect access to the vault.
Path to Prod is free. If you would like to support ongoing development, you can do so optionally on Ko-fi. Donations do not unlock features or change forecast behavior.
Path to Prod initiates network requests to the configured Jira API host and optional HTTPS ICS calendar feeds. Obsidian's requestUrl handles these requests, so the plugin has no separate proxy service or proxy credential setting. Corporate proxy, VPN, certificate, and allowlist policy still apply to the app's network connection. The Jira token is stored in Obsidian SecretStorage; the token-holder label, project key, private calendar URLs, cached issue metadata, and crew leave dates are stored in the vault's local plugin data file. The plugin has no telemetry, analytics, advertising, or developer-operated server. Protect the vault and use dedicated, revocable credentials with the least Jira permissions that allow the required project and issues to be read. Do not sync the plugin data file to an untrusted location. Older copies or backups of data.json may still contain a token saved by earlier releases; remove or rotate those separately according to company policy.
For every simulation, the engine:
The displayed P80 date means 80% of the simulated outcomes completed on or before that date under the configured assumptions.
The score is used only to choose relevant historical tickets; it is not a developer performance score. A historical ticket receives up to 17 similarity points: same issue type (4), same priority (1), shared components (up to 4), shared labels (up to 3), and overlapping summary terms (up to 5). The engine samples real durations from the 20 closest tickets.