wcchristian17 downloadsTable, List, Kanban, Calendar, and Timeline views for Obsidian Bases.
Turn your notes into calendars, agendas, task lists, kanban boards, and timelines with five custom views for Obsidian Bases. Edit properties and move notes directly in each view. Your data stays in ordinary Markdown files.

List and Agenda previews with fictional sample notes. The first card in each view has its details expanded; appearance follows your theme.
| View | What you can do |
|---|---|
| Calendar | Plan in month, week, or agenda layouts. Drag notes to reschedule them and create notes for a selected day or date range. |
| List | Browse notes in a flat or grouped list, mark tasks complete, and expand card details when you need them. |
| Kanban | Organize notes into columns and optional swimlanes. Move cards between groups, add notes inline, and show cover images. |
| Timeline | See date ranges at day, week, or month zoom. Drag bars to move them and resize their edges to change dates. |
| Table | Edit properties in columns, group rows, and resize or reorder columns with mouse and keyboard controls. |
Use the native Bases filters, sorting, grouping, and property selection with every view. The plugin works with your own property names; it does not require a particular task or project structure.
Work:orange.Requires Obsidian 1.10.2 or later with the Bases core plugin enabled. Supports desktop and mobile. Dataview is not required.
WCC Base Views is not yet listed in the Community plugins catalog. To install the current release:
main.js, manifest.json, and styles.css from its assets..obsidian/plugins/wcc-base-views/ folder, creating the folder if needed.Once the catalog listing is available, you can search for WCC Base Views under Community plugins → Browse and install it there.
date, done, and project.For a task list, a note could start with these properties:
---
date: 2026-10-12
done: false
project: '[[Projects/Work]]'
priority: high
status: Todo
order: 10
---
The note's filename supplies its title. None of these property names are mandatory. For this example:
date, and List or Calendar's Done property to done.project, with a rule such as Work:orange.priority, with rules such as high:red, med:orange, and low:blue.status. Use a numeric Sort order property, such as order, when you want to save manual ordering.To hide completed tasks, add a Base filter for done not being true. Completion alone does not remove a note from the view. Calendar needs a valid date to display a note; Timeline needs a start date and can also use an end-date property.
New notes use Bases' own creation settings. Adding a note in a calendar day or grouped view supplies that date or group value.
Edits, completion toggles, and drag operations update note properties in your vault. File and formula properties are read-only. Enter or clicking away saves an edit; Escape cancels it. Links open their targets, and you can click the space beside a link to edit its property.
The plugin does not collect telemetry or require an account or subscription. Backgrounds and Kanban covers can use vault attachments or image URLs. An external image URL loads from its host; use vault attachments for local images.
This plugin is under active development. Licensed under MIT.