Dave Smith1k downloadsAdds project progress views to TaskNotes project notes.
TaskNotes Views adds Project management progress charts to TaskNotes project notes in Obsidian.

timeEstimate and unitless estimates such as story points.The reporting time span comes from the configured project start and end frontmatter properties (defaults scheduled and due):
---
scheduled: 2026-07-27
due: 2026-08-09
---
When Derive date range from tasks is enabled, a missing start falls back to the earliest configured scheduled or started date among project tasks, and a missing end falls back to the latest task due date.
TaskNotes statuses configured as skipped are excluded from scope, scheduled, started, and completed values.
The hover popup omits Scope and Target because they do not represent task events on a particular day. Scheduled, Started, and Completed entries include matching task names with scope prefixes, such as [45m] Polish the silverware or [2] Brew moonlight espresso.
Each recurrence is treated as a logical work item:
complete_instances and skipped_instances provide completion and skip history for non-materialized occurrences.Virtual occurrences cannot expose an independent started date. They remain unstarted until completed. Materialized occurrences can contribute started work through their configured started property.
Enable Estimate capacity from past velocity to compare planned scope with an estimated capacity. Estimated capacity appears in the Scope heading for the progress graph, for example:
Scope / Capacity
9 / 10 (90%)
Capacity is calculated from completed task scope during the six weeks before the project starts:
An estimate requires at least three completed scoped work items spanning at least three weeks. If history is insufficient, the widget retains the normal Scope metric and displays a notice that not enough historical data exists to estimate capacity.
| Setting | Default | Purpose |
|---|---|---|
| Project start property | scheduled |
Project frontmatter property containing the reporting start date. |
| Project end property | due |
Project frontmatter property containing the reporting end date. |
| Derive date range from tasks | Off | Fills missing project boundaries from task dates. |
| Scope property | timeEstimate |
Task property containing duration, points, or another numeric scope value. |
| Scope is a duration | On | Formats scope as minutes and hours instead of a unitless number. |
| Estimate capacity from past velocity | Off | Compares planned scope with recency-weighted historical capacity. |
| Task started property | startedAt |
Task property recording when work actually began. |
| Task scheduled property | scheduled |
Task property recording when work is planned to begin. |
| In-progress statuses | in-progress |
Comma-separated status values that count as started. TaskNotes-completed statuses are always included. |
| Count weekends | Off | Allows ideal target progress and capacity scaling to count Saturdays and Sundays. |
Install from the Obsidian community plugin catalog and enable TaskNotes Views under Settings → Community plugins.
Install dependencies and start the watch build:
npm install
npm run dev
Available validation and packaging commands:
npm run typecheck
npm test
npm run lint
npm run build
npm run copy-files
npm run build:test
npm run copy-files copies main.js, manifest.json, and styles.css to destinations listed in .copy-files.local, the OBSIDIAN_PLUGIN_PATH environment variable, or the default TaskNotes end-to-end test vault.
Add user-facing changes to docs/releases/unreleased.md, then prepare a release with npm's version command:
npm version patch
git push --follow-tags
Use minor, major, or an explicit semantic version instead of patch when appropriate. The version lifecycle synchronizes manifest.json and versions.json, promotes the unreleased notes to docs/releases/<version>.md, regenerates the release index, commits the changes, and creates the version tag. Pushing the tag triggers GitHub Actions, which builds the plugin and creates a draft GitHub release using that Markdown file. Review and publish the draft in GitHub.
npm run version only invokes the lifecycle script directly and does not create npm's version commit or Git tag; use npm version ... for releases.