Noriyuki Okamoto2k downloadsEdit Mermaid diagrams — flowchart, kanban, quadrant, xychart, gantt, and more — in your notes with a GUI editor. Saves back as plain Mermaid text.
Edit Mermaid diagrams — flowcharts, sequence diagrams, class diagrams, Gantt charts, kanban boards, and more — with a visual GUI editor, right inside your Obsidian notes. Everything is saved back as plain Mermaid text, so your notes stay portable and readable with any other Markdown/Mermaid tool.
This plugin adds an Edit button to every ```mermaid code block — in Reading view, in Live Preview, and in Source mode. Live Preview is where most people will use this day to day, since it's Obsidian's default editing view. Clicking it opens a modal with a diagram-specific GUI editor: some diagram types (flowchart, Gantt, kanban, quadrant, XY chart) get a fully interactive canvas you drag and drop directly; the rest (sequence, class, pie, and so on) get a structured form editor next to a live preview that updates as you type. Either way, no hand-written Mermaid syntax is required.
These clips show a sample of what's possible, not the full feature set — and since the plugin keeps evolving, actual behavior may have since diverged from what's shown here.
Insert a new diagram from the template picker

Flowchart: edit node shapes directly on the canvas

Flowchart: add a subgraph and change its direction
Kanban: drag-and-drop cards and columns

Quadrant chart: drag points, source stays in sync

XY chart: bar + line series, editable inline

Gantt: manage task dependencies

Obsidian notes are meant to stay plain, portable Markdown, so editing shouldn't cost you that. The plugin parses the Mermaid source into an in-memory intermediate representation (IR) while you edit, then writes back only standard Mermaid syntax on save — GUI-only state like node positions is never part of what gets saved, so the file stays exactly what any other Mermaid tool expects.

sequenceDiagram
participant File as Note File
participant Core as Parser / Generator
participant GUI as Visual Editor
File->>Core: Read the Mermaid source
Core->>GUI: Provide the parsed intermediate representation (IR)
loop While the editor is open
GUI->>GUI: Handle drag operations and update element positions
Note right of GUI: Editor-specific state, such as node positions,<br>is kept only for the current session
GUI->>Core: Apply changes to the IR
Core->>GUI: Regenerate Mermaid source for the code pane
end
Core->>File: Serialize the IR back into standard Mermaid syntax
Note over File: Editor-specific state is not persisted in the file
Edit button on every mermaid block, in Reading view, Live Preview, and Source mode alike, plus a command-palette / right-click action to edit the block under your cursor
Insert new diagram — pick a diagram type from a template picker and start building with the GUI immediately (command palette or editor context menu)
Diagram-specific GUI editors: interactive canvas for flowcharts, draggable bars for Gantt, a full drag-and-drop board for kanban, direct point-dragging for quadrant/XY charts, and structured form editors with a live preview for the rest
Non-destructive round-trip — syntax the parser doesn't understand yet (classDef, style, linkStyle, click, …) is preserved verbatim instead of being dropped
Undo / Redo and SVG export, consistent across every editor
Follows your Obsidian theme (light/dark, and community themes) automatically
Unsupported diagram types still get a plain source-text editor as a fallback, so nothing is ever locked out of editing
| Diagram type | Keyword | GUI editor |
|---|---|---|
| Flowchart | flowchart / graph |
✅ Interactive canvas |
| Quadrant chart | quadrantChart |
✅ Interactive canvas |
| XY chart | xychart-beta |
✅ Interactive canvas |
| Gantt chart | gantt |
✅ Interactive canvas |
| Kanban board | kanban |
✅ Interactive canvas |
| Sequence diagram | sequenceDiagram |
✅ Form + live preview |
| Class diagram | classDiagram |
✅ Form + live preview |
| State diagram | stateDiagram-v2 / stateDiagram |
✅ Form + live preview |
| Pie chart | pie |
✅ Form + live preview |
| Sankey diagram | sankey-beta |
✅ Form + live preview |
| Timeline | timeline |
✅ Form + live preview |
| ER diagram | erDiagram |
✅ Form + live preview |
| Mindmap | mindmap |
✅ Form + live preview |
| User journey | journey |
✅ Form + live preview |
| Architecture diagram | architecture-beta |
✅ Form + live preview |
| Block diagram | block-beta |
✅ Form + live preview |
| Radar chart | radar-beta |
✅ Form, but no live preview (Obsidian's bundled Mermaid doesn't render it) |
| Treemap / Venn diagram | treemap-beta / venn-beta |
⚠️ Source-only (structured data, no visual canvas or form yet) |
| Anything else | — | ⚠️ Plain source-text editor |
Edit an existing diagram
```mermaid block — Reading view, Live Preview, and Source mode all work.Create a new diagram
```mermaid fence at your cursor.Via Community Plugins
Via BRAT
Useful if you want to track pre-release builds ahead of what's in the community directory.
Manually
npm install && npm run build (see Development) to produce main.js and styles.css.main.js, styles.css, and manifest.json into <vault>/.obsidian/plugins/mermaid-gui-editor/.No network access. The plugin never sends any data anywhere — it only reads and writes the note you're editing, locally.
Scoped writes. Saving only rewrites the exact fence you opened; before writing, the plugin re-verifies the fence's start/end lines so a note edited elsewhere while the modal was open can't be corrupted.
No proprietary state in your files. Node positions and other GUI-only data exist only for the editing session and are never persisted to the note — what's saved is standard Mermaid text, nothing else.
Desktop only (isDesktopOnly: true) — not available on Obsidian Mobile.
radar-beta has a GUI editor, but Obsidian's bundled Mermaid doesn't render that diagram type, so no live preview is shown. treemap-beta and venn-beta are source-only editors (no visual canvas) for the same underlying reason.
Editing always opens a modal — there's no fully inline, in-place GUI woven directly into the Live Preview text yet (it would have to contend with CM6 for control of the editor, IME composition, and undo history).
Index-based linkStyle N declarations aren't tracked structurally, so reordering edges can shift which style applies to which edge.
The flowchart Curve setting (%%{init: {"flowchart": {"curve": "..."}}}%%) may not visibly affect rendering, depending on the Mermaid version bundled with your Obsidian install. This is a known, currently unresolved upstream Mermaid bug in the flowchart-v2/dagre-wrapper renderer (mermaid-js/mermaid#6193, fix in progress via PR #6408) — the Mermaid saved by this plugin is correct either way, and the setting will take visible effect once Obsidian ships a Mermaid version with the upstream fix.
The Gantt editor's preview axis may show slightly different tick dates than the diagram's actual rendered output (e.g. in Reading view), if your system isn't set to UTC. This plugin computes all dates/ticks in UTC, while Mermaid's own renderer parses dates and lays out axis ticks in your local timezone — the saved Mermaid source is unaffected either way, only the two axes' gridline positions can diverge slightly.
npm install
npm run dev # esbuild watch — reload Obsidian after main.js/styles.css rebuild
npm run build # typecheck + production bundle
npm run typecheck
npm run test
npm run test:watch
For local testing, symlink the repo into your vault's plugins folder instead of copying files on every change:
# Windows (PowerShell, run as Administrator)
New-Item -ItemType Junction `
-Path "<vault>\.obsidian\plugins\mermaid-gui-editor" `
-Target "<repo>\."
Run npm run dev in the repo and reload Obsidian (Ctrl/Cmd+R) to pick up changes.
The flowchart editor's architecture — React Flow for the node/edge canvas, Zustand for state, Dagre for auto-layout — follows the approach used by Mermaid Visual Editor. This plugin wouldn't have come together nearly as fast without that reference.