Search...Search plugins and themes...
⌘K
Sign in
  • Get started
  • Download
  • Pricing
  • Enterprise
  • Account
  • Obsidian
  • Overview
  • Sync
  • Publish
  • Canvas
  • Mobile
  • Web Clipper
  • CLI
  • Learn
  • Help
  • Developers
  • Changelog
  • About
  • Roadmap
  • Blog
  • Resources
  • System status
  • License overview
  • Terms of service
  • Privacy policy
  • Security
  • Community
  • Plugins
  • Themes
  • Discord
  • Forum / 中文论坛
  • Merch store
  • Brand guidelines
Follow us
DiscordTwitterBlueskyThreadsMastodonYouTubeGitHub
© 2026 Obsidian

Gantt this

AltarokAltarok5k downloads

Interactive Gantt charts for custom TTRPG calendars, with support for Bases views. Track campaign events, eras, and timestamps directly from note frontmatter.

Add to Obsidian
Gantt this screenshot
Gantt this screenshot
Gantt this screenshot
  • Overview
  • Scorecard
  • Updates77

Obsidian plugin able to show a Gantt chart for multiple fantasy calendars.

See this for more extensive documentation: https://altarok.github.io/quartz/

Hint: This is an automated translation of the German README (LIESMICH.md).

Welcome to the documentation for the Gantt Timeline Plugin for Obsidian. This plugin allows you to clearly display your notes and events in interactive timelines.

Timeline Example View

Features & Structure

  • Events: Each point or bar in the timeline corresponds to an event.
    • Bars: Represent time spans.
    • Points / Symbols: Represent specific points in time or milestones.
  • Decentralized in FrontMatter: Events are defined directly within the YAML properties of your Markdown files.
  • Structuring: Events can be organized, filtered, and sorted by groups and custom calendars.
  • Flexible Visibility: Groups, calendars, time spans, and individual points can be shown or hidden independently.
  • Custom Styling: Points in time can be customized with icons from Lucide and custom colors.
  • Interactivity:
    • Mouseover displays relevant metadata in a tooltip (Desktop).
    • Clicking an event directly opens the source note—optionally jumping to a specific heading.
    • Full navigation via drag & zoom (mouse wheel on Desktop, touch gestures on mobile devices).

Data Safety & Privacy: The plugin reads your notes and can insert a code block into your current file upon request. It never deletes data from your vault and makes no network connections.

Getting Started

Gantt Chart / Timeline Creation

There are two simple ways to embed a timeline into a note:

Option 1: Via Command / Ribbon Icon (Recommended)

  1. Click the ribbon icon or open the command palette and select: Gantt this: Open code block creator.
  2. The modal guides you step-by-step through the configuration:
  • Folder for Events: Specify where the plugin should search for notes with event data (includes a toggle for recursive search in subfolders).
  • Folder for Calendars: Specify where custom calendar definitions are stored.
  • By default, the folder of the currently active file is suggested for both.
  1. At the bottom of the modal, you can copy the generated code block or insert it directly at your current cursor position.

Option 2: Manually in the Editor

Simply paste the following code block into any Markdown file:

```gantt-this
```

Populating Your Gantt Chart / Timeline

To display one or more notes as events in your timeline, add the corresponding properties to the YAML frontMatter of your Markdown file:

---
gantt-item: true           # Marks the note as an event
gantt-start: 2026-01-01    # Start date / point in time
gantt-end: 2026-01-05      # Optional: End date (Fallback is 'gantt-start')
gantt-name: "My Project"   # Optional: Name (Fallback is the file name)
gantt-group: "Development" # Optional: Group (Fallback is 'general')
---

Additional FrontMatter Options

The following table lists all available properties you can use in your notes:

Property Type / Values Optional? Default / Fallback Description
gantt-item Boolean No true Marks the note as an event target for the plugin.
gantt-start String No None (Note will be ignored without a start value) Start date or start value of the event.
gantt-end String Yes Value of gantt-start End date of the event. If identical to start value, a point is displayed.
gantt-name String Yes File name without extension (file.basename) Name of the event in the timeline and tooltip.
gantt-type String Yes Plugin standard calendar Determines the assigned calendar type.
gantt-group String Yes 'general' Group used for row layout and structuring.
gantt-color Color (e.g. #ff0000, red) Yes Group color → Calendar color → Default Overrides the background color of the event individually.
gantt-displayIcon String Yes None Displays an icon on the event.
gantt-displayIconColor Color (e.g. #ff0000, red) Yes Default icon color Sets the color of the icon.
gantt-symbol bar, point, icon, ... Yes bar (time span) or point (point in time) Sets the visual representation format of the event.
gantt-linkToHeader String Yes None (Jumps to top of file) Links directly to a specific heading when clicked.

Custom Calendar Definitions

If you use custom time systems or fictional calendars in your vault, you can define them using a separate note:

Property Type / Values Optional? Default / Fallback Description
gantt-type-definition String No None Unique identifier of the calendar for referencing via gantt-type.
HealthExcellent
ReviewPassed
About
Juggling two moons and three eras? Track it all seamlessly. Define custom TTRPG calendars and display campaign timelines over thousands of years or down to a single day. All inside Obsidian's Bases. Gantt-this visualizes your campaign events as interactive Gantt-style charts directly from note frontmatter. Organize and filter eras, timespans, timestamps and groups; apply custom icons and colors; and smoothly navigate timelines with drag, zoom, and touch controls. Click any event to instantly jump to its source note or a specific header. Works with custom fantasy calendars as well as real-world systems like the Mayan calendar.
TTRPGCalendarVisualization
Details
Current version
1.9.1
Last updated
Yesterday
Created
6 months ago
Updates
77 releases
Downloads
5k
Compatible with
Obsidian 1.13.0+
Platforms
Desktop, Mobile
License
MIT
Report bugRequest featureReport plugin
Author
AltarokAltarokaltarok
GitHubaltarok
  1. Community
  2. Plugins
  3. TTRPG
  4. Gantt this

Related plugins

Itinerary

Make planning your trip or event easier by rendering a calendar from event information found in your notes.

Yearly Glance

Year at a glance - overview of annual events with customizable management options.

Heatmap Tracker

Visualize your activity and track goals, progress, habits, tasks, exercise, finances, and more—all in a single, interactive heatmap!

Prisma Calendar

Prisma turns any note with a date into a flexible planning system inside Obsidian. There are no rigid schemas or predefined structures — just your data, your rules, fully under your control.

Excalidraw

Visual PKM powerhouse. Create and edit Excalidraw drawings.

Advanced Canvas

Supercharge your canvas experience. Create presentations, flowcharts and more.

ExcaliBrain

An interactive, structured mind-map of your Obsidian vault.

Breadcrumbs

Visualise the hierarchy of your vault using a breadcrumb trail or matrix view.

Mermaid Tools

Improved Mermaid.js experience: visual toolbar with common elements and more.

TaskNotes

Note-based task management with calendar, pomodoro and time-tracking integration.