Search...Search plugins and themes...
⌘K
Sign in
  • Get started
  • Download
  • Pricing
  • Enterprise
  • Account
  • Obsidian
  • Overview
  • Sync
  • Publish
  • Canvas
  • Mobile
  • Web Clipper
  • CLI
  • Learn
  • Help
  • Developers
  • Changelog
  • About
  • Roadmap
  • Blog
  • Resources
  • System status
  • License overview
  • Terms of service
  • Privacy policy
  • Security
  • Community
  • Plugins
  • Themes
  • Discord
  • Forum / 中文论坛
  • Merch store
  • Brand guidelines
Follow us
DiscordTwitterBlueskyThreadsMastodonYouTubeGitHub
© 2026 Obsidian

Rowbase

soulaymane01soulaymane012k downloads

Interactive database for Obsidian with different views backed by human-readable .rbase files. Supports formulas, rollups, relations, sorting, filtering, grouping

Add to Obsidian
Rowbase screenshot
Rowbase screenshot
Rowbase screenshot
Rowbase screenshot
  • Overview
  • Scorecard
  • Updates9

Rowbase is an Obsidian plugin that brings Notion-style databases to your vault. Each database is a single .rbase file — a human-readable CSV with JSON column metadata — that opens in a rich, interactive view with multiple layouts, formulas, relations, and more.

Demo

Rowbase demo (table to kanban)

Rowbase icon

Features

Views

  • Table — Full-featured spreadsheet with inline editing, sorting, filtering, column resizing, and row reordering
  • Kanban — Drag-and-drop board grouped by a select column
  • List — Compact grouped rows with collapsible sections
  • Gallery — Card grid with cover images and clickable detail modals
  • Chart — Bar, Line, Pie, and Area charts with aggregation and color-by options
  • Stats — Summary cards, numeric stats, select color distribution, and date distribution
  • Timeline — Gantt-style timeline with status colors, grid lines, today marker, zoom, and tooltips
  • Dashboard — Habit tracking with streaks, completion rings, and activity calendar heatmap
  • Matrix — Eisenhower matrix with four urgency/importance quadrants driven by select, checkbox, or date columns

Column Types

  • Text, Number, Date, Checkbox, Select, Multi-select, Title, Note, Relation, URL, Link, Image, Rollup, Formula, Progress

Data & Computation

  • Formulas — Safe expression evaluator with cell references and cross-relation aggregation (SUM, AVG, COUNT, MIN, MAX) plus IF and DAYS (date difference)
  • Rollups — Aggregate related rows (sum, count, avg, min, max) across relation columns
  • Relations — Link rows across databases; preloaded resolver with cache for fast cross-file lookups
  • Sorting — Multi-column sort with ascending/descending toggle
  • Filtering — Text (contains, starts with, is empty), Number (>, <, between), Date (before, after, between), Select (is, is not), Checkbox filters
  • Grouping — Group rows by any column with collapsible sections

UI/UX

  • Inline editing — Click any cell to edit; text, number, date, and select types all editable in place — kanban cards edit fields inline too
  • Undo/Redo — Cmd+Z / Cmd+Shift+Z with 100-step history stack
  • Column management — Add, rename, resize (double-click to auto-fit), reorder, delete columns via context menu
  • Title linking — Open or create notes from title cells; configure note folder per column
  • Folder linking — Create folders directly from title cells; configure default folder per column
  • Note columns — Pick or create notes with a default folder and optional multiple notes per cell
  • Links in text — [[wikilinks]] inside text cells resolve and open notes
  • Multi-select keyboard nav — Arrow keys, Enter to select, Escape to close
  • Empty states — Friendly placeholder with icons when databases or views are empty
  • Mobile responsive — Optimized for tablets and phones with touch-friendly targets
  • Import/Export — Import CSV files into databases; export to CSV or JSON
  • Plugin settings — Default folder, template name, a validated template-columns editor, note/folder linking defaults, and show-row-numbers

Screenshots

Table View

Table view with projects

Kanban Board

Kanban board view

Chart View

Sales chart with data visualization

Timeline View

Timeline Gantt chart

Stats View

Statistics dashboard

Dashboard View

Habit tracking dashboard

Inline Editing

Inline cell editing

Installation

From the Community plugins store (recommended)

  1. Open Settings → Community plugins in Obsidian.
  2. If needed, turn off Restricted mode, then search for Rowbase — or open obsidian.md/plugins?id=rowbase and press Install.
  3. Enable the plugin in the same screen.

Want the latest beta before it hits the store? Install it via BRAT with the repo Soulaymane01/Rowbase.

Rowbase is 100% offline — no account, no telemetry; your data stays in your vault.

Manual installation

  1. Download main.js, manifest.json, and styles.css from the latest release
  2. Create a folder rowbase in your vault's .obsidian/plugins/ directory
  3. Copy the three files into that folder
  4. Enable Rowbase in Settings → Community Plugins

Usage

  1. Use the command palette (Ctrl/Cmd + P) and run Create new database to create a .rbase file
  2. Add columns using the + button in the header row
  3. Add rows using the + New button at the bottom
  4. Switch views using the view selector in the toolbar
  5. Sort, filter, and group rows using the toolbar controls

The .rbase file is a standard CSV file with column metadata encoded in the header row. It remains human-readable and can be opened with any text editor or spreadsheet application.

The complete file-format reference for AI agents lives in SKILL.md — it documents everything needed to create and edit .rbase files through direct file manipulation.

Development

npm ci
npm run dev    # watch mode
npm run build  # production build

To test locally, create a symlink from your vault's plugin directory to the project root:

ln -s /path/to/rowbase /path/to/vault/.obsidian/plugins/rowbase

Offline baseline

Rowbase's runtime is fully offline. It makes no HTTP requests, WebSocket connections, telemetry, CDN asset fetches, or remote service calls; everything reads from and writes to the local Obsidian vault. Its runtime source and the production bundle are audited against that policy by:

npm run build            # produces main.js
npm run test:offline     # scans src/ and main.js for network/dynamic-code behavior

Credits

Rowbase is an engineering fork of jysperm/obsidian-csv-database. The upstream project is licensed under the MIT License; that license and attribution are preserved in LICENSE. Rowbase is itself released under the MIT License.

HealthExcellent
ReviewPassed
About
Create Notion-style databases as single .rbase files (human-readable CSV with JSON column metadata) and view them in rich, interactive layouts. Use table, kanban, list, gallery, chart, timeline and dashboard views with relations, rollups, formulas, sorting, filtering, grouping, inline editing, and title-to-note linking.
TablesVisualization
Details
Current version
0.1.5
Last updated
Last month
Created
2 months ago
Updates
9 releases
Downloads
2k
Compatible with
Obsidian 1.6.6+
Platforms
Desktop, Mobile
License
MIT
Report bugRequest featureReport plugin
Author
soulaymane01soulaymane01
GitHubsoulaymane01
  1. Community
  2. Plugins
  3. Tables
  4. Rowbase

Related plugins

Excalidraw

Visual PKM powerhouse. Create and edit Excalidraw drawings.

Advanced Canvas

Supercharge your canvas experience. Create presentations, flowcharts and more.

ExcaliBrain

An interactive, structured mind-map of your Obsidian vault.

Mermaid Tools

Improved Mermaid.js experience: visual toolbar with common elements and more.

Breadcrumbs

Visualise the hierarchy of your vault using a breadcrumb trail or matrix view.

Advanced Tables

Improved table navigation, formatting, and manipulation.

Maps

Adds a map layout to bases so you can display notes as an interactive map view.

CSV Table

Render CSV data as a table within your notes.

Sheets Extended

Vertical headers, merged cells, and custom CSS tables with Advanced Tables compatability.

Datacore

An even faster reactive query engine for the data obsessed.